[Nov-2021] Verified C-IBP-2105 dumps Q&As - C-IBP-2105 dumps with Correct Answers [Q40-Q60]

Share

[Nov-2021] Verified C-IBP-2105 dumps Q&As - C-IBP-2105 dumps with Correct Answers

The Best SAP Certified Application Associate Study Guide for the C-IBP-2105 Exam

NEW QUESTION 40
What is a prerequisite for modeling outsourced manufacturers with production capacity?

  • A. Model production costs for internal and external production resources to model priority.
  • B. Model target inventory and stocks at the outsourced location.
  • C. Ensure that multiple modes of transportation are set up.
  • D. Use production lead times and offsets to manage components at the outsourced location.

Answer: A

 

NEW QUESTION 41
How can you check if key figure is editable or non-editable?

  • A. Using the Edit View and then the Edit Planning View option
  • B. Using the Web-based Planning app when selecting key figures
  • C. Using the Key Figure Calculations app
  • D. Using the Analytics Advanced app when selecting key figures

Answer: B

 

NEW QUESTION 42
You are modeling the introduction of a new product using Lifecycle Planning functionality in SAP IBP.
What is mandatory to create in your planning area for the setup of reference product(s) to work? Note:
There are 2 correct Answers to this question.

  • A. Definition of an attribute representing the product ID
  • B. Definition of an attribute representing the product description
  • C. Planning objects for the new product
  • D. Definition of Actual Sales business meaning for one key figure

Answer: A,C

 

NEW QUESTION 43
Which header name displays are available in the Report Options menu of the SAP IBP Excel interface?
Note: There are 2 correct Answers to this question.

  • A. Changed member names that the user had created
  • B. Business meaning, as defined in configuration
  • C. Full unique name including the dimension and technical name
  • D. Caption, as defined in configuration for the default name

Answer: B,C

 

NEW QUESTION 44
You are adding a value-based filter to a planning view. Which of the following conditions apply? Note:
There are 3 correct Answers to this question.

  • A. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • B. These filters are always applied based on the values stored in the database.
  • C. You can only apply one value-based filter per planning view.
  • D. You can add (or delete) planning objects to a planning view after these filters are applied.
  • E. These filters can be used together with attribute totals in the same planning view.

Answer: A,B,C

 

NEW QUESTION 45
Which of the following are features of the S&OP process templates? Note: There are 2 correct Answers to this question.

  • A. New instances of templates allow for re-use of the same processes again.
  • B. The number of steps in a process template is the same for all implementations.
  • C. Each step depicted in the template can have tasks associated with it.
  • D. All process templates are assigned to dashboards.

Answer: A,C

 

NEW QUESTION 46
Which library is used by the forecasting engine for the demand sensing algorithm?

  • A. Heuristics library
  • B. Predictive analytics library
  • C. Demand library
  • D. Supply chain algorithm library

Answer: D

 

NEW QUESTION 47
While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand. Which solution would apply to this scenario? Note: There are 2 correct Answers to this question.

  • A. Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.
  • B. Enough demands can be pulled forward and pull production will occur.
  • C. Capacity leveling will be possible for production and storage resources.
  • D. Excess stock can be generated and will need to be staged in an overflow warehouse.

Answer: A,B

 

NEW QUESTION 48
Analytics charts are created by the user in the Advanced Analytics application. What actions are possible in the Advanced Analytics app? Note: There are 2 correct Answers to this question.

  • A. Group data.
  • B. Open graphics in Excel.
  • C. Merge charts together.
  • D. Apply filters on your data.

Answer: A,D

 

NEW QUESTION 49
You are reviewing the master data types for supply planning. Which master data types are compound master data types? Note: There are 2 correct Answers to this question.

  • A. LOCATIONFR
  • B. SOURCEPRODUCTION
  • C. SOURCECUSTOMER
  • D. SOURCELOCATION

Answer: C,D

 

NEW QUESTION 50
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check. Which settings can you change and still run a successful consistency check?
Note: There are 2 correct Answers to this question.

  • A. Change the past and future horizon of the levels in the time profile.
  • B. Add a new time profile level to the time profile.
  • C. Change the description of the attributes in the time profile.
  • D. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.

Answer: A,C

 

NEW QUESTION 51
Which of the following settings can you use in your supply planning background job triggered from Excel? Note: There are 2 correct Answers to this question.

  • A. Type of algorithm to use
  • B. UOM to ID
  • C. Target currency
  • D. Planning unit

Answer: A,B

 

NEW QUESTION 52
Which of the following is one of the functions of multi-echelon inventory optimization?

  • A. Ability to optimize delivery costs between different locations
  • B. Ability to maintain high external service levels with low internal service levels
  • C. Ability to optimize lead times between different locations
  • D. Ability to maintain high external service levels with high internal service levels

Answer: B

 

NEW QUESTION 53
You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be applied to? Note: There are 2 correct Answers to this question.

  • A. Planning view templates in the SAP IBP add-in for Microsoft Excel
  • B. Snapshot operator in the SAP IBP add-in for Microsoft Excel
  • C. Jobs in the Applications Jobs app
  • D. Supply chain graph in Supply Chain Network app

Answer: A,C

 

NEW QUESTION 54
A time profile is defined with the levels of day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other buckets?

  • A. IF("PERIODID3" ="$$PERIODID3CU$$...)
  • B. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • C. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • D. IF("PERIODID4" ="$$PERIODID4CU$$...)

Answer: D

 

NEW QUESTION 55
For which of the following application jobs can you enter planning filters as parameters? Note: There are
2 correct Answers to this question.

  • A. Purge Master Data
  • B. Create Time Periods for Time Profiles
  • C. Purge Non-Conforming Data
  • D. Purge Key Figure Data

Answer: A,D

 

NEW QUESTION 56
What are S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments. Additional tiering costs (default). Target inventory violation cost
  • B. Number of fair share segments. Maximum inventory. Additional tiering costs (default)
  • C. Number of fair share segments. Maximum days of coverage. Number of fair share segments late delivery
  • D. Number of fair share segments. Additional tiering costs (default). Number of fair share segments late delivery

Answer: D

 

NEW QUESTION 57
What setting is mandatory in the Manage Lifecycle Planning app when introducing a new product?

  • A. Define at least one attribute of the planning area which represents the Product ID
  • B. Define which phase-in and phase-out profiles can be used within Lifecycle Planning
  • C. Define which is the attribute ID for the Lifecycle profiles
  • D. Define which key figure can be used as sales history for new products

Answer: D

 

NEW QUESTION 58
Which of the following key functions are supported by SAP IBP for sales and operations? Note: There are
2 correct Answers to this question.

  • A. A basic demand planning process
  • B. Finite resource planning
  • C. Manual creation of feasible constrained plans
  • D. An advanced demand planning process

Answer: A,B

 

NEW QUESTION 59
How can you make charts and dashboards private?

  • A. Enable the relevant settings in the global configuration parameters.
  • B. Enable the relevant settings in the Analytics Advanced and Dashboards Advanced applications.
  • C. Choose only relevant key figures and filters in the Analytics Advanced application.
  • D. Set restrictions for charts in the Permission filter application.

Answer: A

 

NEW QUESTION 60
......


SAP C-IBP-2105 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
User Interface > 12%

Use the Fiori Launchpad to customize the UI, work with Excel UI

Key Figures & Attributes > 12%

Create and use key figures and attributes.

General Configuration of a Planning Area > 12%

Display, create, copy, edit, check, and activate a planning area.

Solution Architecture < 8%

Describe the benefits of implementing SAP's Integrated Business Planning solution.

Inventory < 8%

Optimize inventory in the supply chain utilizing algorithms that derive inventory targets.

Analytics and Reporting < 8%

Define and view information with user-defined charts and dashboards.

Demand Planning 8% - 12%

Create statistical forecast using historical data with basic methods.

Planning Operators & Application Jobs > 12%

Use Planning Operators.

S&OP Review < 8%

Describe how IBP extends the logic of S&OP in the network using advanced demand and supply planning integrated with financial plans.

Supply and Response > 12%

Configure supply planning, run various solvers to generate planning results


 

C-IBP-2105 certification guide Q&A from Training Expert Pass4sures: https://www.pass4sures.top/SAP-Certified-Application-Associate/C-IBP-2105-testking-braindumps.html