[Nov-2022] SAP C-IBP-2208 Test Engine PDF - All Free Dumps from Pass4sures [Q17-Q38]

Share

[Nov-2022] SAP C-IBP-2208 Test Engine PDF - All Free Dumps from Pass4sures

Get New C-IBP-2208 Certification – Valid Exam Dumps Questions


SAP C-IBP-2208 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe the benefits of implementing SAP's Integrated Business Planning solution
  • Configure supply planning, run various solvers to generate planning result
Topic 2
  • Display, create, copy, edit, check, and activate a planning area
  • Planning Operators & Application Jobs
Topic 3
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
  • Create and use key figures and attributes
Topic 4
  • Define and view information with user-defined charts and dashboards
  • General Configuration of a Planning Area
Topic 5
  • Create statistical forecast using historical data with basic methods
  • Supply planning integrated with financial plans

 

NEW QUESTION 17
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.

  • A. Response Planning
  • B. Demand Sensing
  • C. Sales and Operations Planning
  • D. Inventory Optimization
  • E. Demand Driven Replenishment

Answer: B,C,D

 

NEW QUESTION 18
Which features apply to quota violations modeled with the optimizer?

  • A. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
  • B. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.
  • C. Min and Max Quotas have to be the same as sourcing ratios.
  • D. Quotas can be modeled for sourcing location, production, and consensus demand.

Answer: A

 

NEW QUESTION 19
What function would you use to configure a year-to-date calculation?

  • A. Rolling Aggregation
  • B. Dynamic Rolling Aggregation
  • C. Last Period Aggregation
  • D. Cumulative Aggregation

Answer: D

 

NEW QUESTION 20
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.

  • A. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level
  • B. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
  • C. Calculating how many periods inventory is going to last based on the planned demand
  • D. Search for and return the last not null value of the inventory key figure

Answer: C,D

 

NEW QUESTION 21
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.

  • A. Demand Sensing with Gradient Boosting (Full)
  • B. Charts creation in SAP Supply Chain Control Tower
  • C. Supply Heuristics in SAP IBP for sales and operations
  • D. Decoupling Points determination in SAP IBP for demand-driven replenishment

Answer: A,C

 

NEW QUESTION 22
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Model relative production costs across internal locations and outsourced manufacturing locations
  • B. Use production lead times and offsets to manage components at the outsourced manufacturing location
  • C. Model target inventory and stocks at the outsourced manufacturing location
  • D. Ensure that the outsourced manufacturing locations have a separate subnetwork

Answer: A

 

NEW QUESTION 23
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.

  • A. Promotion Sales Lift Elimination
  • B. Bias Detection and Correction in Sales History
  • C. Intermittency Detection and Correction in Sales History
  • D. Substitute Missing with Mean or Median in Sales History

Answer: A,D

 

NEW QUESTION 24
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.

  • A. Transportation Lead Time Error CV
  • B. Holding Cost Percentage
  • C. Target Service Level
  • D. Minimum Lot Size

Answer: C,D

 

NEW QUESTION 25
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Trend Chart Types
  • B. Seasonal Chart Types
  • C. Simulation Chart Types
  • D. Comparison Chart Types
  • E. Geographic Chart Types

Answer: A,B,D

 

NEW QUESTION 26
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?

  • A. Created as type INTEGER and assigned to a simple master data type
  • B. Created as type NVARCHAR and assigned to an external master data type
  • C. Created as type DECIMAL and assigned to a compound master data type
  • D. Created as type INTEGER and assigned to a compound master data type

Answer: C

 

NEW QUESTION 27
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Adjusted transport receipts
  • B. Transportation lead times
  • C. Aggregated constraints
  • D. Minimum lot size
  • E. Maximum lot size

Answer: A,B,E

 

NEW QUESTION 28
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.

  • A. The number of steps in the realignment run is limited to 255.
  • B. The name of the realignment step should be no longer than 20 characters.
  • C. A realignment step can change master data, planning objects and key figures.
  • D. You must mark the realignment step as "shared" and assign the steps to users.

Answer: C,D

 

NEW QUESTION 29
How many different time levels can be selected within one planning view?

  • A. All time levels available in the time profile
  • B. Only base time levels of the planning area
  • C. All time levels available in the time profile, restricted by global configuration parameter
  • D. Only time levels from the base planning level of selected key figures

Answer: A

 

NEW QUESTION 30
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?

  • A. Download the Initial Problem Report in the Data Integration app.
  • B. Download the Rejection Report in the Data Integration app.
  • C. Navigate to the Manage Master Data app and open the Log.
  • D. Navigate to the Master Data Workbook in Excel and open the Log.

Answer: C

 

NEW QUESTION 31
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.

  • A. Target Cycle Stock
  • B. Component Usage
  • C. Reorder Point
  • D. Recommended Safety Stock
  • E. Target Pipeline Stock

Answer: A,D,E

 

NEW QUESTION 32
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.

  • A. Cloud Integration for Data Services
  • B. Smart Data Integration
  • C. Real-time Integration
  • D. Cloud Identity Authentication Service

Answer: A,B

 

NEW QUESTION 33
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.

  • A. Copy the launch dimension from the reference product to the new product
  • B. Enter the product family to which the new product belongs
  • C. Create planning objects for new combinations in the app
  • D. Enter the Phase-out Start Date and Phase-out End Date

Answer: A,C

 

NEW QUESTION 34
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.

  • A. Using Driver-Based planning
  • B. Leveraging the functionality of SAP Workzone
  • C. Using Microsoft Excel planning views
  • D. Leveraging the web-based planning capability

Answer: C,D

 

NEW QUESTION 35
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.

  • A. Discretization
  • B. Time profile level
  • C. Global cost factors
  • D. Processing mode

Answer: C,D

 

NEW QUESTION 36
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

  • A. Planning with Product Allocations
  • B. Analyze Supply Usage
  • C. Detailed Production Scheduling
  • D. Gating Factors

Answer: B,D

 

NEW QUESTION 37
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

  • A. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
  • B. Set up a three-tier landscape using transport, starting from the development system to test and production.
  • C. Create additional planning areas in the test system to support training needs.
  • D. Create additional test planning areas in the production system to support cutover needs.

Answer: A,B

 

NEW QUESTION 38
......

100% Passing Guarantee - Brilliant C-IBP-2208 Exam Questions PDF: https://www.pass4sures.top/SAP-Certified-Application-Associate/C-IBP-2208-testking-braindumps.html