NEW QUESTION 43
What is the correct sequence of steps for adding Management Reporting embedded content to a report package?
- A. Open the doclet, check out the doclet, embed the management reporting content, upload and Check in the revised doclet
- B. Open the doclet, check out the doclet, within Smart view use the Report Settings Smart view shared connection to import the management report, upload and check in the revised doclet
- C. Open both the management reporting reference doclet and the regular doclet, check out the regular doclet, copy and paste the management report, upload and check in the revised doclet
- D. Open the management report in the web interface, export it to excel, checkout the doclet, copy and paste the Excel export to the doclet, upload and check in the revised doclet
Answer: A
NEW QUESTION 44
Which two statements are TRUE about the Review Process in Enterprise Performance Reporting Cloud Service?
- A. It can have multiple Reviewers per Report Packages.
- B. It can have multiple Review Phases per Report Package.
- C. It can have multiple simultaneous Review Instances per Report Package.
- D. It can have multiple Review Cycles per Report Package.
Answer: A,B
NEW QUESTION 45
You have created a package and want to include data that can be only downloaded and viewed? What type of doclet would you use?
- A. Finalized
- B. Supplemental
- C. Reference
- D. Doclet
- E. Approved
Answer: A
NEW QUESTION 46
What type of doclet is excluded from the review and signoff phases?
- A. Reference
- B. package
- C. Author
- D. Supplemental
- E. Style Sample
Answer: D
Explanation:
Explanation
Supplemental documents such as procedures, instructions, reference material, and so on, can be uploaded into a report package as a supplemental doclet. Supplemental documents can be any type of document file (for example, PDF, Excel, Word, and so on). As the content for supplemental doclets is not included within the merged report, these doclets are excluded from the review and sign off processes. The supplemental doclet contents cannot be viewed online, but users can download and use native programs to open the supplemental doclet in the same way that you can work with third party artifacts in the library.
https://docs.oracle.com/cloud/latest/eprcs_common/URPRV/report_package_components_155597.htm#URPRV
NEW QUESTION 47
What are two ways to insert new members into a Management Reporting grid?
- A. Type them directly into the row and/or column header boxes.
- B. Use Member Selector.
- C. Type them directly into the member selection box.
- D. Type them directly into the dimension layout screen.
Answer: A,C
NEW QUESTION 48
When can the properties of the Report Package be edited?
- A. at any time in the Report Package development process
- B. only before the Report Package process has been started or after the Report Package process has been stopped or completed
- C. solely while the Report Package is being created
- D. solely before the Review Phase has been started for the Report Package
- E. solely before the Author Phase has been started for the Report Package
Answer: C
NEW QUESTION 49
Which are valid steps when creating a Package?
- A. Create Doclet, Add Package, Apply Users/Groups, Add Author
- B. Design, Author, Review, Approve
- C. Create Report, Add Users, Apply Security, Distribute
- D. Create Package, Assign Phases, Add Doclet, Organize Sections, Add Author
- E. Report Center, Create Doclet, Apply Phases, Approval. Finalize
Answer: E
NEW QUESTION 50
You want to add a logo to your Doclets, where would you make this update?
- A. Design Phase
- B. Format Grid
- C. Report Package
- D. Author Phase
- E. Style Sample
Answer: C
NEW QUESTION 51
Which of the following is a snapshot of the Report Package that when you create this, the system renders all of the checked-in versions of the Doclets into a draft version of the report?
- A. Reference Doclet
- B. Review Instance
- C. Review Cycle
- D. Review Phase
Answer: B
Explanation:
Explanation
https://docs.oracle.com/cloud/latest/eprcs_common/MRPRO/managing_the_review_phase_106336.htm#MRPR
NEW QUESTION 52
Which two file formats are supported by Management Reporting?
- A. .des
- B. HTML
- C. .epr
- D. PDF
- E. Excel
Answer: D,E
Explanation:
Explanation
https://docs.oracle.com/cloud/latest/eprcs_common/ADEPR/ADEPR.pdf
NEW QUESTION 53
Which two statements are TRUE about Alias Tables utilized within a Custom Application?
- A. Additional alias tables for dimension members can be viewed in the Detailed View of the web user interface.
- B. Additional alias tables for dimension members can be viewed when querying data in Smart View.
- C. Additional alias tables for dimension members can be viewed in the Table View of the web user interface.
- D. The initial Alias Table is named "Default" but can be renamed as needed.
- E. Additional Alias Tables cannot be deleted after they have been created.
Answer: C,D
NEW QUESTION 54
For which two components can an audit file be created?
- A. Report Packages
- B. My Library
- C. Data Sources
- D. Recent folders
- E. Reports
Answer: A,D
NEW QUESTION 55
What type of variable can you use for standardizing a Date in a doclet?
- A. Supplemental
- B. Varying
- C. Reference
- D. Static
Answer: C
NEW QUESTION 56
What three types of mapping reviews can you export anytime during the filing process to analyze and identify potential issues?
- A. Summary mapping review
- B. Duplicate mappings review
- C. Detailed mapping review
- D. Negative values review
- E. Positive values review
Answer: A,B,E
NEW QUESTION 57
At which time can the report package owner choose to initiate a review instance?
- A. at any time
- B. never -- only the Admin may initiate a review instance
- C. when the Author Phase is Approved
- D. when the Author Phase is completed
Answer: A
Explanation:
Explanation
The report package owner can choose to initiate a review instance at any time. Oracle Enterprise Performance Reporting Cloud does not require the author phase to be in a completed status. Once the first review cycle is initiated, the report package status changes to "Under Review".
https://docs.oracle.com/cloud/latest/eprcs_common/MRPRO/managing_the_review_phase_106336.htm#MRPR
NEW QUESTION 58
Which two methods can be used to delete an existing management report grid?
- A. Press the X button in the top right-hand corner.
- B. Right click the grid and choose Delete.
- C. Drag and drop the grid off of the report.
- D. within Report Actions, select Delete.
Answer: A,B
NEW QUESTION 59
Your package details are finalized for the month. What step would you take to ensure no updates are made to the doclets?
- A. Remove Security
- B. Lock Content
- C. Remove doclet
- D. Approve Content
- E. Signoff Content
Answer: D
NEW QUESTION 60
Which four steps must be performed before data can be loaded into a Custom Application?
- A. Name the Application
- B. Deploy the Models and Dimensions
- C. Create Dimension(s) and Add Model(s) to dimensions
- D. Load Dimension Members
- E. Validate the Application
- F. Apply Security
Answer: B,C,D,E
NEW QUESTION 61
Where do you define the data to include in an Excel reference doclet?
- A. in a Package, define process
- B. in Excel using a member formula
- C. in a doclet, using a formula
- D. in report center, using static variables
- E. in Excel, using named ranges
Answer: E
NEW QUESTION 62
During the review phase what doclet is excluded?
- A. Check-out
- B. Reference
- C. Package
- D. Author
- E. Supplemental
Answer: E
NEW QUESTION 63
Which statement about the set up of Disclosure Management security is NOT true?
- A. It grants access to master documents and doclets using Explorer in the Disclosure Management Smart View extension.
- B. It defines permissions for Disclosure Management artifacts from the EPRCS web client.
- C. It grants access to master documents and doclets by using Access Control Lists (ACLs).
- D. Permissions available for Disclosure Management include View and Administrator
Answer: A
NEW QUESTION 64
Which two items are true about creating Custom Applications in Enterprise Performance Reporting Cloud Service?
- A. In order to load data to a Custom Application, the models and Dimensions must first be deployed and application validated.
- B. Up to three Custom Applications can be created per environment.
- C. Only Service Administrators and/or Application Administrators can create a Custom Application.
- D. Dimensions and their members are assigned to a model to group and manage them tor data entry and reporting.
- E. Up to five models can be utilized within an application.
Answer: A,B
NEW QUESTION 65
......