Latest Jan 27, 2022 Real E_S4HCON2020 Exam Dumps Questions Valid E_S4HCON2020 Dumps PDF [Q13-Q31]

Share

Latest Jan 27, 2022 Real E_S4HCON2020 Exam Dumps Questions Valid E_S4HCON2020 Dumps PDF

SAP E_S4HCON2020 Exam Dumps - PDF Questions and Testing Engine


E_S4HCON2020 Exam Certification Details:

Duration:90 mins
Sample Questions: SAP E_S4HCON2020 Exam Sample Question
Cut Score:68%
Exam:40 questions

 

NEW QUESTION 13
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can record the modification adjustment during migration and use the transports in the next runs.
  • B. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
  • C. You can verify that the content of the download directory matches the stack.XML file.
  • D. You can find the optimal number of parallel R31oad processes by monitoring host performance.

Answer: B,D

 

NEW QUESTION 14
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.

  • A. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • B. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • C. An upgrade of the software components is performed, without changing the database type.
  • D. A change of the database type is performed, without changing the software components.

Answer: D

 

NEW QUESTION 15
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. You need to build up a SI check framework by applying SAP notes.
  • B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • C. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • D. Depending on the SAP S/4HANA version, there are different SI check frameworks.

Answer: A,D

 

NEW QUESTION 16
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Activation of dictionary objects in phase ACT_UPG
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • E. Import of upgrade and language data from the download directory in phase TABIM UPG

Answer: A,B,E

 

NEW QUESTION 17
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. The link to different patch levels to SUM
  • B. An overview about possible upgrade paths
  • C. The corrections to the SUM Guide
  • D. AA

Answer: A,B,C

 

NEW QUESTION 18
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • B. Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure.
  • C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • D. Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU
    & UC) procedure.

Answer: A

 

NEW QUESTION 19
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The DMO Guide
  • C. The Application Guide
  • D. The SAP S/HANA Conversion Guide

Answer: B,D

 

NEW QUESTION 20
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system.
What do you need to consider?
Please choose the correct answer.
Response:

  • A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • B. The upgrade of the PRD must be finished before you start new development in the DEV.
  • C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • D. The transport between Unicode and non-Unicode systems is forbidden.

Answer: C

 

NEW QUESTION 21
During a SUM run you vivant to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R31oad processes on the host of the primary application server
  • B. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • C. Check for running R3trans processes on the host of the primary application server
  • D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Answer: C,D

 

NEW QUESTION 22
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests that are assigned to the project SAP_ADJUST

Answer: B

 

NEW QUESTION 23
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

Answer: A

 

NEW QUESTION 24
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:

  • A. Check the dump size of the database export on disk
  • B. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • C. Check the "Charts Control Center" in the SUM UI
  • D. Check the log files written under "SUM\abap\log"

Answer: C

 

NEW QUESTION 25
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above?
There are 3 correct answers to this question.
Response:

  • A. Dual Stack split
  • B. Release upgrade
  • C. Database migration
  • D. Support Package Stack update
  • E. Homogenous system copy

Answer: B,C,D

 

NEW QUESTION 26
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Activation of dictionary objects in phase ACT_UPG
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • E. Import of upgrade and language data from the download directory in phase TABIM UPG

Answer: A,B,E

 

NEW QUESTION 27
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Breakpoint configuration file SAPUPPHAS.BRK
  • B. Stack XML file calculated by the Maintenance Planner
  • C. Parameter file SAPup_add.par
  • D. MIGRATE_DT_DUR_XML file from a previous run

Answer: B,D

 

NEW QUESTION 28
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It is target release specific
  • B. It is a database-specific document
  • C. It contains a troubleshooting section
  • D. It contains a section "free space requirements"

Answer: A,D

 

NEW QUESTION 29
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. ATC (ABAP Test Cockpit)
  • B. SYCM (Simplification Database Content)
  • C. SE80 (Object Navigator)
  • D. SAT (Runtime Analysis)

Answer: A,C

 

NEW QUESTION 30
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • B. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • C. An upgrade of the software components is performed, without changing the database type.
  • D. A change of the database type is performed, without changing the software components.

Answer: D

 

NEW QUESTION 31
......

Reliable SAP Certified Technology Specialist E_S4HCON2020 Dumps PDF Jan 27, 2022 Recently Updated Questions: https://www.pass4sures.top/SAP-Certified-Technology-Specialist/E_S4HCON2020-testking-braindumps.html