NEW QUESTION # 75
Which of the following tasks must have an associated document?

  • A. Notification
  • B. ToDo
  • C. Approval
  • D. Review

Answer: C,D


NEW QUESTION # 76
Which of the following event templates should be used whensourcing a commodity product that is a subject to frequent price fluctuations, and where participants bid in discounts relative to a baseline?

  • A. Index-based auction
  • B. Total cost auction
  • C. Reverse auction with a bid transformation
  • D. Traffic light auction

Answer: A


NEW QUESTION # 77
What event type does the unstructured Excel import support?

  • A. inRFP events
  • B. Large-capacity events
  • C. Auctions
  • D. RFI events

Answer: A


NEW QUESTION # 78
Which of the following innovations focus on direct material sourcing?Note: There are 2 correct answers to this question.

  • A. Guided Buying
  • B. Discount Management
  • C. Cost Breakdown
  • D. Product Sourcing

Answer: C,D


NEW QUESTION # 79
Which of the following considerations should you keep in mind when using auction template? Note: there are
2 correct answers to this question.

  • A. Expected low competition between strategic and preferred suppliers
  • B. Contains high price variance
  • C. Runs over a short period of time
  • D. Price is the most important factor

Answer: B,C


NEW QUESTION # 80
What step of the Create Analytical Report process allows you to apply an initial filter before executing the report?

  • A. Refine Data
  • B. Source Data
  • C. Pivot Layout
  • D. View Report

Answer: A


NEW QUESTION # 81
Why would you run an RFI before conducting an RFP or an auction?

  • A. To gather pricing and capability information
  • B. To verify if suppliers can meet the specifications
  • C. To gain a preliminary bid from each supplier
  • D. To narrow the list of suppliers to invite to later events;

Answer: B,D


NEW QUESTION # 82
Which of the following content items can be created as a prerequisite to view event content?

  • A. Requirment
  • B. Lot/Lineltems
  • C. Attachment
  • D. Question

Answer: D


NEW QUESTION # 83
In the enablement workbook, what does U* stand for?

  • A. User licence for each licensed solution
  • B. User iD for each licensed solution
  • C. User licence applicable only to SAP Ariba Sourcing
  • D. User licence applicable only to SAP Ariba Supplier information and Perfomance Management

Answer: A


NEW QUESTION # 84
What are the steps for creating a BOM quote?

  • A. On SAP Ariba Dashboard > click on create > BOM quote
  • B. Select material > get quote > BOM quote
  • C. Select material > Bom quote > using sourcing project
  • D. Select the parent BOM > Get quote > using sourcing project > Bom quote

Answer: A


NEW QUESTION # 85
Which of the following integration options leverages comma-separated values (CSV) upload over HTTPS?

  • A. Batch file channel transfer with the integration toolkit (ITK)
  • B. Web services (SOAP)
  • C. Mediated connectivity (Customer middleware)
  • D. SAP direct connectivity

Answer: A


NEW QUESTION # 86
What supplier data is stored in SAP Ariba Sourcing?

  • A. Supplier location
  • B. Remittance location
  • C. Common supplier
  • D. Partioned supplier

Answer: C


NEW QUESTION # 87
What limitation do large capacity events have outside of the user interface? Note: there are 2 correct answers to this question.

  • A. The system limit is 2000 line items
  • B. The system limit 125 suppliers
  • C. The system limits the bidding through Microsoft Excel only
  • D. The system limit is 30 terms per line

Answer: B,C


NEW QUESTION # 88
A folder in the Sourcing Library contains highly confidential information. How do you ensure that this confidential information is only visible to authorized users?

  • A. Hide the folder in a subfolder
  • B. Set an access control on the folder
  • C. Set a password on the folder
  • D. Add the users to Team tab in the Sourcing Library

Answer: B,D


NEW QUESTION # 89
What is a sourcing request?

  • A. A document that is used to ask the company authorized sourcing team to bid a product or service
  • B. A copy of an existing sourcing project used as a staring point for a new sourcing project
  • C. A project that automatically becomes a full sourcing project upon approval
  • D. A document sent to a supplier to obtain information prior to a sourcing event

Answer: A


NEW QUESTION # 90
Which of the following best describes a traffic light auction format?

  • A. Supplier submit decreasing bids within staggered lots that do not include overtime
  • B. Supplier submit decreasing bids within serial lots with durations displayed via color coded icons
  • C. Supplier submit decreasing bids and receive feedback on whether their bid will be considered via color coded icons.
  • D. Supplier must pass an access gate with prerequisites before participating in the full auction

Answer: D


NEW QUESTION # 91
......