Guaranteed Accomplishment with Newest Dec-2021 FREE VMware 5V0-41.20 [Q19-Q41]

Share

Guaranteed Accomplishment with Newest Dec-2021 FREE VMware 5V0-41.20

Use Valid New Free 5V0-41.20 Exam Dumps & Answers


Introduction to VMware 5V0-41.20: VMware vSAN 6.7 Specialist Exam

Candidates for the 5V0-41.20: VMware vSAN 6.7 Specialist Exam are attempting to demonstrate their ability to design key HTML5 client applications that can operate on today’s touch-enabled computers (PCs, tablets, and phones). While HTML is commonly thought of as a web technology that is made in a browser to produce a user interface, this exam focuses on developing client applications using HTML5, CSS3, and JavaScript.

Candidates should have a sound fundamental knowledge of the topics illustrated in the preparation document, including CSS and JavaScript, before taking the 5V0-41.20 exam test. Exam candidates should be acquainted with the principles of the application life cycle, Debug and validate an HTML5-based application, and have some hands-on experience with the related technology, either by specific training courses or through interacting with videos and demos available on MSDN and in VmWare Visual Studio. The 5V0-41.20 test will allow you to prepare so that you will have a silent similar test until the real test. VMware SD-WAN Troubleshooting 5V0-41.20 PDF questions can be used in a number of ways to give you the best insight into your exam scenario. It will also train you to plan your time for the actual VMware 5V0-41.20 test inside the given framework. But it also shows you time control, in other terms. To ensure the progress of the final exam, you need to go through our IT team’s given 5V0-41.20 test questions

 

NEW QUESTION 19
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot gel to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.

A business policy is created and saved.
How can the network administrator verify the business policy is working?

  • A. Select a VCE > Test & Troubleshoot > Remote diagnostics and select List Active flows and check the flows to see what Business policy is applied under the Business policy column.
  • B. Executing Route table dump under VCE > Test St Troubleshoot > Remote Diagnostics and select Route Table dump and look for business policy applied in the Route table Dump stats.
  • C. Check under Monitor > Applications tab and check the listing of applications at the bottom of the screen and the category of the type of traffic there.
  • D. Check under the Monitor > Business Priority tab for Business policy statistics.

Answer: B

 

NEW QUESTION 20
Scenario 3:
After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.

A network administrator is receiving complaints that a real-time voice application is not performing well, with choppy audio, and dead audio especially during peak traffic times.
What two actions can the administrator take to diagnose and fix the issue? (Choose two.)

  • A. Check the status of the links using the QoE and Transport tabs for any degraded underlay issues or congestion issues.
  • B. Configure a QoS policy to rate limit all traffic during peak times.
  • C. Ensure that the realtime application is matching the correct application type using the diagnostics page.
  • D. Configure a QoS policy to load balance the realtime traffic across all links.

Answer: A,B

 

NEW QUESTION 21
Scenario 2:
After completing the branch activation activities for all required branches, the administrator attempts to test connectivity between the various branches and between the hubs and branches- The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.

The tunnel from the Dallas site to the Seattle hub is not coming up.
What are two things that should be checked to determine the issue? (Choose two.)

  • A. Dynamic Branch to Branch is not enabled.
  • B. Spoke Edge and Hub Edge have a mismatched certificate.
  • C. Hub WAN Interface might be behind a firewall.
  • D. Spoke Edge and Hub Edge are two different Edge models.

Answer: B,D

 

NEW QUESTION 22
Scenario 3:
After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed thatduring certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.

Users at the Dallas Branch are complaining that downloads/uploads from Office365 are slow. Working in Teams has been providing slow responses. The Internet circuit is 100Mbps while the MPLS Circuit is
45Mbps. Upon troubleshooting, the network administrator has noticed the traffic is Backhauling through the Seattle hub for all internet traffic.
How should the network administrator resolve the issue?

  • A. Leave the system as is, the gateways will resolve the issues after doing 15 minutes of link qualification.
  • B. Leave the system as is, the hubs will auto-rebalance tunnels after doing 15 minutes of link qualification.
  • C. Advertise public routes to Office365 and Teams through the New York Hub.
  • D. Prevent the hub from advertising a default route.

Answer: C

 

NEW QUESTION 23
Scenario 2:
After resolving numerous connectivity Issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.

A network administrator has configured a Business Policy to send a specific application directly out an underlay interface. Users have complained of slow responses for that application. While troubleshooting, the network administrator finds the traffic is actually taking an overlay path to another SD-WAN Edge.
What is causing this behavior?

  • A. uI has been configured forcing traffic into the underlay towards the hub.
  • B. Internet Backha.
  • C. The underlay path is not available forcing traffic into the overlay.
  • D. Configuring Business Policy Direct settings have no affect on traffic flows.
  • E. The other Edge location is advertising a secure route for the application's subnet.

Answer: A

 

NEW QUESTION 24
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.

The tunnel from spoke to hub is not coming up. What are the two possible reasons? (Choose two.)

  • A. Dynamic Branch to Branch is not enabled.
  • B. Hub WAN Interface might be behind the NAT Device or firewall.
  • C. Spoke Edge and hub Edge are two different Edge models.
  • D. Spoke Edge and hub Edge have a mismatch certificate authentication mode.

Answer: B,D

 

NEW QUESTION 25
Scenario 3:
After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.

Users at a remote office are complaining about poor performance with certain applications. The network administrator has already configured Business Policies based on these requirements.
What is the sequence of parameters that the administrator can check to troubleshoot this problem? (Choose two.)

  • A. Under Monitor, check Routing tab.
  • B. Check underlay network (bandwidth, latency, jitter, packet loss).
  • C. Review Business Policies configuration and match them against the business requirements.
  • D. Change the bandwidth measurement under WAN Overlay Advanced Settings.

Answer: A,B

 

NEW QUESTION 26
Scenario 3:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.

The network administrator determines that dynamic routes to SD-WAN sites are missing at the San Jose branch router. The network administrator decides to look into the configurations of hub Edges. All SD-WAN branch sites must use a hub to communicate with the San Jose site. Best practices have been implemented at these SD-WAN sites.
Where should the administrator check first to verify if the configuration is correct?

  • A. Verify that redistribution between the primary hub site and San Jose is enabled.
  • B. Verify that the NVS feature is enabled in Cloud VPN.
  • C. Verify the static routes to San Jose from all Branches are configured.
  • D. Verify that redistribution at the Dallas Hybrid Site is enabled for San Jose to use as a peering point.

Answer: C

 

NEW QUESTION 27
Scenario 3:
After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Exhibit.

A network administrator decides to deploy a local Checkpoint VNF appliance on the Edge in London to cut back on unnecessary traffic towards the NY hub location.
The Checkpoint VNF and associated security services were successfully deployed at the London Branch.
Users are now are complaining that Webpages are extremely slow to load, just like before.
What should the administrator do?

  • A. Verify to see if a firewall rule in the Edge is set to allow traffic to the Checkpoint VNF.
  • B. Reboot the Edge, as this is a requirement in the deployment of a Security VNF.
  • C. Disable and redeploy the VNF with lower memory requirements.
  • D. Check the flow records in Remote Diagnostics.

Answer: C

 

NEW QUESTION 28
Scenario 3:
After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that callquality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.
Users at multiple branches complain that a highly performant SQL Database cluster residing at the New York Data Center is not responding to database queries or inserts as expected. It is affecting the order management site. A network administrator investigates and finds that traffic from the branches are going through Seattle to reach the SQL Cluster in New York. The design for this SD-WAN network does not call for routing security.
The SQL Cluster is reachable through either Data Center, but for performance reasons, must flow through the New York DC. The network administrator has verified that the routes are not present in the OFC and the BGP neighborship is down in Network Services.
Refer to the Exhibit(s).
Exhibit.


What should the administrator verify?

  • A. The BGP configuration has a filter in place to deny the prefix in New York.
  • B. The BGP Authentication matches on both sides.
  • C. Backhauling through the Seattle DC is disabled.
  • D. The BGP configuration has a filter in place to deny the prefix in Seattle.

Answer: C

 

NEW QUESTION 29
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.

Users at the London site are complaining of various intermittent issues around websites not loading, or applications being remotely accessed disconnecting sporadically and reconnecting after a few minutes. The network administrator does not see anything strange on the Edge overview page and decides to check if the CPU or memory have been hitting close to 100%.
Where should the administrator verify this information?

  • A. In the VCO > Test 8c Troubleshoot > Remote Diagnostics > System Status
  • B. In the VCO > Monitor > Alerts
  • C. In the VCO > Monitor > Click London_Site01 > Click the System Tab
  • D. In the VCO > Remote Troubleshooting > Remote Actions > System Status

Answer: C

 

NEW QUESTION 30
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.

A network administrator has received an email from the applications development team requesting connectivity to their AWS VPC.
The administrator has configured the tunnel via the VMware SD-WAN Gateway. The tunnel status icon has not turned green.
Where are two places the administrator must check? (Choose two.)

  • A. Determine if the PSK is mismatched between the AWS side and the VeloCloud Edge.
  • B. Determine if the NVS has been enabled and assigned to a profile.
  • C. Determine if the PSK is mismatched between the AWS side and the VeloCloud Gateway.
  • D. Determine if the DH parameter on the Edge has been configured.

Answer: A,C

 

NEW QUESTION 31
Scenario 2:
After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.
Exhibit.

A network administrator is trying to create multiple overlays on a single physical interface on an Edge. The administrator is able to bring up only a single overlay so far, but is having trouble with bringing up additional overlays.
What could be the possible reason?

  • A. On the WAN overlay configuration, verify the IP address, next-hop, and the VLAN ID configuration.
  • B. The administrator does not have the right permission to create multiple overlays. The administrator needs to have an Operator-level privilege for this task.
  • C. Multiple overlays cannot be created on a single physical interface. Multiple physical interfaces are needed.
  • D. The licensing does not support multiple overlays on a single physical interface.

Answer: D

 

NEW QUESTION 32
Scenario 1:
The Dallas Branch location is having issues getting activated. The local network administrator is aware that the Edge device received a DHCP address and was able to connect to the internet. The Orchestrator is reporting the Edge as Down. No other changes were made post activation.
A network administrator is tasked with enabling SD-WAN at three branch locations. A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of time. The organization has several branch sites. One is am Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center locations in this environment as well. Please refer to the topology.
Refer to the Exhibit(s).


What is the cause of this issue?

  • A. The activation link did not contain any post-activation configuration to allow the Orchestrator to communicate with the Edge.
  • B. The activation link contained incorrect configurations for WAN overlays and WAN interfaces.
  • C. The activation link did not specify the updated image location requiring the Edge to be re-activated.
  • D. The Edge will be offline for about 4 hours until it has completed the factory image installation.

Answer: C

 

NEW QUESTION 33
......

5V0-41.20 Braindumps PDF, VMware 5V0-41.20 Exam Cram: https://www.pass4sures.top/VMware-SD-WAN-Troubleshoot-2021/5V0-41.20-testking-braindumps.html