NEW QUESTION 26
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The following question requires your selection of CCC/CCE Scenario 26(2.5.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Select the statement that best describes the meaning of the +/-notations associated with an estimate. The actual cost is expected:
- A. To fall within the percentage range stated
- B. To be exactly the percentages stated
- C. To be outside the percentages stated
- D. To be higher or lower that the percentages stated
Answer: A
NEW QUESTION 27 
The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
6,573 hours have been expended to date. Planned completion at this time is 60%. The project is determined to be 55% complete. How many hours have been earned?
- A. 6,960
- B. 6,573
- C. 7,200
- D. 6,600
Answer: B
NEW QUESTION 28
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
After an individual's safety needs are met, what needs would the individual be motivated to fulfill next in Maslow's hierarchy of needs?
- A. Self-actualization
- B. Belonging needs
- C. Knowledge
- D. Pay and compensation
Answer: B
NEW QUESTION 29
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the "book value (BV) of the asset at the end of 5 years?
- A. $3,200
- B. $16,000
- C. $64,000
- D. $60,000
Answer: C
NEW QUESTION 30 
The following question requires your selection of CCC/CCE Scenario 6 (2.7.50.1.3) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the relative frequency of unit costs from Atlanta, GA?
- A. $48.33
- B. $40.59
- C. 33.33%
- D. 0
Answer: C
NEW QUESTION 31
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
You have been asked to provide ETC information to management. Based on the following information, what is the ETC?
Original Budget = $9,000,000 Actuals to date = $3,513,000
Current estimate at completion = $10,613,000
Actuals for current month = $1,200,000
- A. $10,613,000
- B. $9,000,000
- C. $5,487,000
- D. $7,100,000
Answer: D
NEW QUESTION 32 
The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
At the end of 30 months, copper prices will have increased by what percentage over today's price?
- A. 3.5%
- B. 2.5%
- C. 6.6%
- D. 4.6%
Answer: B
NEW QUESTION 33 
The following question requires your selection of CCC/CCE Scenario 28 (3.7.50.1.7) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
An unbalanced bid methodology can best be used by:
- A. Engineer working for the owner (Plan A)
- B. Contractor working directly for engineer (plan A or B)
- C. Subcontractor working for contractor (Plan A or B)
- D. Engineer/contractor working for the owner (Plan B)
Answer: D
NEW QUESTION 34 
The following question requires your selection of CCC/CCE Scenario 6 (2.7.50.1.3) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the range of estimated quantities?
- A. $26.78 to $75.00
- B. $45 to $530
- C. $485
- D. $48.22
Answer: B
NEW QUESTION 35
If you deposit $100 per month for two (2) years and earn interest at 12% APR (Annual Percentage Rate) compounded monthly, how much will you have at the end of the period?
- A. $2,424
- B. $2,688
- C. $2,697
- D. $2,976
Answer: A
NEW QUESTION 36 
The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
At the end of Year 4, the commodity which experienced the greatest projected percentage price index increase over today is:
- A. None of the above
- B. Copper
- C. Manufacturing labor
- D. Steel
Answer: C
NEW QUESTION 37
Which of the following is NOT an aspect of quality management?
- A. Quality assurance
- B. Quality planning
- C. Quality checking
- D. Quality control
Answer: C
NEW QUESTION 38
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator
designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
If $50 was invested at 6.0% on January 1, year 1, what would be the value of year-end withdrawals made in equal amounts each year for 10 years and leaving nothing in the fund after the tenth withdrawal?
- A. $6.80
- B. $3.10
- C. $2.22
- D. $5.35
Answer: A
NEW QUESTION 39 
The following question requires your selection of CCC/CCE Scenario 6 (2.7.50.1.3) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the relative frequency of unit costs amounting to $55.00/unit?
- A. 338.5
- B. $55.00
- C. 0
- D. 22.22%
Answer: D
NEW QUESTION 40
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the 25 year after tax present worth of this project?
- A. $13,738
- B. $22,533
- C. $(22,533)
- D. $137,466
Answer: B
NEW QUESTION 41
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The recognition of loss of value of a natural resource used in the production process is referred to as:
- A. Depreciation
- B. Depletion
- C. Capital reduction
- D. Net loss
Answer: B
NEW QUESTION 42
The purpose of a communication must be understood by ____________ if the message is to be clear to the
- A. Workers; management
- B. Management; workers
- C. The receiver; the speaker
- D. The speaker; the receiver
Answer: B
NEW QUESTION 43 
The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
At the end of Year 3, steel prices will have increased by what percentage over today's price? (round to 1 decimal)
- A. 8.2%
- B. 4.6%
- C. 8.0%
- D. 8.7%
Answer: C
NEW QUESTION 44
The four steps to writing are:
- A. Plan, write, cool, revise
- B. Introduction, paragraph, conclusion, works cited
- C. Start, write, complete, revise
- D. Abstract, body conclusion, bibliography
Answer: A
NEW QUESTION 45 
The following question requires your selection of CCC/CCE Scenario 6 (2.7.50.1.3) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Calculate the mean unit cost.
- A. $48.35
- B. $48.09
- C. $46.59
- D. $48.22
Answer: C
NEW QUESTION 46
A schedule's late dates are calculated during the:
- A. Loop calculations
- B. Backward pass
- C. Float
- D. Forward pass
Answer: B
NEW QUESTION 47
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
According to Maslow's hierarchy of needs, which level should be satisfied first?
- A. Ego-status
- B. Safety needs
- C. Self-actualization
- D. Physiological
Answer: D
NEW QUESTION 48
NO: 37
The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
The entire pipe has been received, hangers have been installed, and all pipes are in place. None has been welded or flushed. What percent complete is this project?
- A. 30%
- B. 50%
- C. 45%
- D. 95%
Answer: C
NEW QUESTION 49
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If $20,000 is invested at the end of each fiscal year for the next 10 years, how much would our total investment be worth assuming the interest is at 10%?
- A. $420,236
- B. $265,798
- C. $318,740
- D. $289,370
Answer: C
NEW QUESTION 50
......
Get 100% Passing Success With True CCP Exam: https://www.pass4sures.top/AACE-Certification/CCP-testking-braindumps.html
Premium Quality AACE International CCP Online dumps: https://drive.google.com/open?id=1NUKLw-kQB17FefzZlh3jDpU3fO5wr0zS